FLOODED KITCHEN & SKIES

Marking out the second earth bag bed in preparation for the Flemington Permablitz

Leveling the base for the earth oven in preparation for the Flemington Permablitz

Gracie dog heps measure out the polybag in preparation for the Flemington Permablitz

Gracie dog inspecting the compost pile in preparation for the Flemington Permablitz

Worker taking a nap on the earthbag garden bed wall in preparation for the Flemington Permablitz

We woke at 5am to a nervous knocking at our bedroom door. Our housemate had awoken to a steady wooshing noise. The origin of the noise soon became clear as I stepped into our suddenly torrential kitchen, water and steam flowing steadily from under the bathroom door, wet feet confusing sleep dazzled brains. The hot water pipe under the sink had burst and drenched everything! After the water was turned off the damage only seemed superficial, but the most pressing danger was the water lapping against the timber stairs. (Thank goodness for stone floors!). So our day began with a 5am mopping session after which instead of starting bright and early on our final preparations for the Blitz we staggered back to bed. Our housemate Laura, disturbed by our night mopping got up early and decided to bake, so we woke at a more respectable hour to a much pleasanter sound and I might add smell or baked oat biscuits.

Continue Reading